Wappinger Town Highway Dept. to Repave and Reconstruct 14 Town Owned Roads May-August

Supervisor Richard L. Thurston, the Wappinger Town Board, and Superintendent of Highways Michael J. Sheehan are proud to announce the repaving and reconstruction of 14 Town owned roadways between May and August 2023.

The Town of Wappinger is excited to pave this number of roads in record timing. We urge our residents to avoid these roadways during these times and to not park on the impacted roadways during the project.

For more information please call the Wappinger Town Highway Department at 845-297-9451.


Roadwork Projects:
    • Beth Place – Ward 3 – Last repaved in 1990
    • Carmel Heights – Ward 4
    • Dennis Road – Ward 3 – Last repaved in 1995
    • Dwyer Lane – Ward 3  – Last repaved in 2002
    • East Salem Road – Ward 2 – Last repaved in 1990
    • Elizabeth Terrace – Ward 4  – Last repaved in 1998
    • Hackensack Hts. Road – Ward 4
    • James Place – Ward 3  – Last repaved in 2002
    • Larissa Lane – Ward 4   – Last repaved in 1998
    • MacFarlane Road (partial) – Ward 2  – Last repaved in 2014 (partial)
    • New Road  – Ward 2  – Last repaved in 1991
    • Rosewood Drive  – Ward 2   – Last repaved in 2003
    • Scott Drive – Ward 3  – Last repaved in 1997
    • Top O’ Hill – Ward 4 – Last repaved in 1994

 

 

Share This Page