Wappinger Town Highway Department To Repave and Reconstruct 10 Town Owned Roads Starting Monday, April 29

Wappinger Town Highway Department To Repave and Reconstruct 10 Town Owned Roads Starting Monday, April 29


TOWN SUPERVISOR JOSEPH D. CAVACCINI, THE WAPPINGER TOWN BOARD, AND SUPERINTENDENT OF HIGHWAYS MICHAEL J. SHEEHAN ARE PROUD TO ANNOUNCE THE REPAVING AND RECONSTRUCTION OF 10 TOWN OWNED ROADWAYS STARTING MONDAY, APRIL 29 THROUGH THE END OF MAY.

The Town of Wappinger is excited to pave this number of roads in record timing and ahead of schedule. The roadways being reconstructed are all approximately two decades old and have surpassed their expected durability. The Town Highway Department will notify residents along impacted routes via letter prior to paving as well as with signage notifying motorists ahead of expected paving times. We urge our residents to avoid these roadways during these times and to not park on the impacted roadways during the project.

For more information, please call the Wappinger Town Highway Department at 845-297-9451.


Roadwork Projects:
    • Brannan Place – Ward 2 – Last repaved in 1994
    • Cider Mill Loop – Ward 4 – Last Repaved in 2004
    • Davies Drive – Ward 3 – Last repaved in 2001
    • MacIntosh Lane – Ward 3 – Last repaved in 2005
    • Marlorville Road – Ward 1
    • Partners Road – Ward 4 – Last repaved in 1998
    • Regency Drive – Ward 4 – Last repaved in 1996
    • Rowell Lane – Ward 3   – Last repaved in 2001
    • Smithtown Road – Ward 2 – Last repaved in 2006
    • Winesap Lane – Ward 4 – Last repaved in 2004
    • Rockingham Park Soccer Complex – Soccerfield Drive

Share This Page